MENSHEN continue to invest in their facilities in Finnentrop, benefiting both the location and the entire Group
The erection of the new hall will create a cohesive production complex which, on the one hand, will prevent unauthorized access and, on the other, provides the preconditions for integrating additional production facilities. Following the partial demolition of a former hall, this space is now being renovated to accommodate the Logistics, Shipping and Customs sections. Once the new hall has been erected, a modern central area for Quality Assurance will also be installed.
The implementation of these building measures takes into account the latest construction engineering standards, including the conversion of the lighting systems to LED technology. On the whole, however, great store is being set on ensuring that as much daylight as possible can enter the hall.